Dewatering & Water Treatment at Perth Busport Project, WA
NPE were involved in this project for the drilling and installation of a series of pumping wells within the excavation and recharge wells outside the excavation to create an efficient dewatering system that depressurised the aquifers and lowered and maintained the groundwater table by eight (8) metres next to the existing underground tunnel. The biggest challenge of the project was to ensure dewatering extraction did not cause any settlement to the neighbouring infrastructures.
Extracted groundwater was recharged into the aquifers via recharge wells outside the excavation zone. The dewatering system was designed to recharge at 35 litres per second at a suitable operating pressure.
Water was treated via a new and improved customised water treatment system designed to perform inline adjustments to water quality by correcting pH levels and removing iron and other harmful heavy metals before being recharged and discharged into the environment. The project saw progress in technology innovation and improvements in environmental aspects by introducing a custom-built sludge press as the key to sludge management.
RECENT POSTS
Dewatering for the construction of an apartment complex in Sydney, NSW
NPE maintains a large and diversified range of high-end pumping, power generation and associated equipment…
Read MorePerth City Link Rail
NPE was contracted with the Perth City Link Rail Alliance to provide a detailed design,…
Read MoreRoy Hill Iron Ore Train Unloader
The Roy Hill project includes the construction of a new iron ore mine at Roy…
Read MoreDewatering & Water Treatment at Perth Busport Project, WA
NPE were involved in this project for the drilling and installation of a series of…
Read MoreElizabeth Quay Project, WA
The Elizabeth Quay project is located in the centre of Perth’s river foreshore and located…
Read More