PROJECT SPOTLIGHTS

Wellpoint Dewatering – SA

Wellpoint Dewatering System for a stormwater upgrade Old Port Road Adelaide, South Australia.Old Port Road is a major arterial road connecting Adelaide and Port Adelaide. Old Port Road was one…

Read More

Wellpoint Dewatering – WA

NPE were engaged by our client regarding installing an LLDPE 11000 litre tank. The depth to the static groundwater level was 1.5m below surface ground level, and the concrete footing…

Read More

Student Accommodation Development – NSW

Student Accommodation Development Dewatering was required to allow for the construction of student accommodation with a 2-level basement car park. Bulk excavation level approx. 5m BEGL with localised pits going…

Read More

Challenging Dewatering on Contaminated Grounds – Balcatta WA

We were engaged by BOS Civil, which required prompt dewatering in troublesome ground conditions throughout their 2 x extensive basin excavation works in Balcatta, WA.  The following morning, NPE mobilised all…

Read More

Hydromining Process Water Pond – Pilbara WA

Over time, water ponds that are gravity fed become full of tailings, which reduce their storage and surge capacity. These ponds require tailings to be removed periodically; however, excavation methods…

Read More

Emptying and Cleaning the Digester – Boliver SA

Digester emptying and cleaning works were carried out utilising NPE’s purpose-built pumping/mixing equipment suspended from a 60t crane. The pump is a heavy-duty, hydraulically powered unit specifically modified by NPE…