Pump Station Bypass – Queensland
A local water authority recently asked NPE to provide a bypass for a pump station, the pump station needed to be taken offline to complete works.
The bypass needed to be capable of 75L/S, this was diverting flow from a DN900 line.
NPE mobilised the necessary pumps & pipework (200m) in a prompt manner delivering an effective solution as per the client’s needs. All discharge pipework (HDPE) was supplied and welded on-site to suit.
This bypass’s technical component was to achieve double isolation on the existing pipework. NPE was able to complete confined space entries into a 13m deep manhole safely to achieve this.
NPE included remote telemetry monitoring, providing a clear picture of the network’s equipment status and fluid level.
The weather was challenging, as 25mm of rain fell the night the system was commissioned. This had a significant impact on the network, but the pumping solution provided was able to handle the increased flow without surcharging or spilling.
RECENT POSTS
Dewatering for the construction of an apartment complex in Sydney, NSW
NPE maintains a large and diversified range of high-end pumping, power generation and associated equipment…
Read MorePerth City Link Rail
NPE was contracted with the Perth City Link Rail Alliance to provide a detailed design,…
Read MoreRoy Hill Iron Ore Train Unloader
The Roy Hill project includes the construction of a new iron ore mine at Roy…
Read MoreDewatering & Water Treatment at Perth Busport Project, WA
NPE were involved in this project for the drilling and installation of a series of…
Read MoreElizabeth Quay Project, WA
The Elizabeth Quay project is located in the centre of Perth’s river foreshore and located…
Read More