Digester Clean Wastewater Treatment Plant, Boliver SA

The process of emptying and cleaning the digester involved using specialised pumping equipment provided by NPE. This was suspended from a 60-ton crane for efficient operation and flexibility of movement.

The pump used for this task was a heavy-duty hydraulic unit specifically adapted by NPE to handle these projects. To remove the contents of the digester, NPE had set up a discharge line connected to an existing pipeline leading to a storage lagoon.

This setup allowed for a smooth and controlled transfer of materials. Throughout the emptying and confined space entry procedures, NPE consistently conducted gas level tests and monitoring to ensure safety. This approach helped maintain a secure working environment and prevent potential risks. If you require any assistance with similar tasks, feel free to contact NPE. They have the expertise and equipment necessary to handle complex projects with the utmost safety and efficiency.

RECENT POSTS

Dewatering for the construction of an apartment complex in Sydney, NSW

NPE maintains a large and diversified range of high-end pumping, power generation and associated equipment…

Read More

Perth City Link Rail

NPE was contracted with the Perth City Link Rail Alliance to provide a detailed design,…

Read More

Roy Hill Iron Ore Train Unloader

The Roy Hill project includes the construction of a new iron ore mine at Roy…

Read More

Dewatering & Water Treatment at Perth Busport Project, WA

NPE were involved in this project for the drilling and installation of a series of…

Read More

Elizabeth Quay Project, WA

The Elizabeth Quay project is located in the centre of Perth’s river foreshore and located…

Read More