Emptying and Cleaning the Digester – Boliver SA
Digester emptying and cleaning works were carried out utilising NPE’s purpose-built pumping/mixing equipment suspended from a 60t crane.
The pump is a heavy-duty, hydraulically powered unit specifically modified by NPE for these applications.
The digester contents were pumped out via an NPE installed discharge line, which was connected to an adjacently installed existing pipeline that ran to the storage lagoon.
NPE tests and monitors gas levels throughout the emptying and Confined Space Entry processes.
After emptying and cleaning, the Digester was sprayed with a commercial-grade disinfectant to enable rehabilitation works to be undertaken in a safe and clean environment within the Digester.
RECENT POSTS
Dewatering for the construction of an apartment complex in Sydney, NSW
NPE maintains a large and diversified range of high-end pumping, power generation and associated equipment…
Read MorePerth City Link Rail
NPE was contracted with the Perth City Link Rail Alliance to provide a detailed design,…
Read MoreRoy Hill Iron Ore Train Unloader
The Roy Hill project includes the construction of a new iron ore mine at Roy…
Read MoreDewatering & Water Treatment at Perth Busport Project, WA
NPE were involved in this project for the drilling and installation of a series of…
Read MoreElizabeth Quay Project, WA
The Elizabeth Quay project is located in the centre of Perth’s river foreshore and located…
Read More