HB01 Wastewater Pump Station Temporary Works, Kilcare NSW

NPE were engaged to provide a temporary works proposal which details the operating strategy and management of the sewer bypass works for HB01 Wastewater pump station in Killcare.

NPE utilised the latest telemetry options and control functions and supplied online log ins to the client.

3 x electric submersibles located within the collection manhole that feed into three separate booster pumps to achieve 57L/s per pump arrangement.

Diesel back up generator supplied with an automatic switch to enable seamless cutover in the event of power failure.

Client successfully completed their work in 4 week duration.