Hydromining – Koolan Iron Ore, WA

To expand the storage capacity of the Sediment Pond at Koolan Island, NPE were engaged to undertake a Hydromining campaign to remove approximately 3,600m3 of settled solids.

NPE used a high-pressure water technique to break down the compacted material into a slurry via water sourced from three Hydromining cannons on the sediment pond’s external perimeter.

The cannons pushed/moved the slurry product to a Hydraulic Pump, suspended in the pond with a crane. The slurry was pumped through a discharge line into a newly constructed sump. The water necessary for the cannons was supplied by a high-pressure diesel-driven pump.

The HP pump was connected to a break tank, supplied with water from the in-pit dewatering system. The estimated flow rate required for the high-pressure pump and cannons was approximately 55 litres per second.

NPE provided three on-site operational personnel to undertake the project. Each shift was led by an experienced NPE-trained Hydromining Supervisor with two Field Technicians supporting.

RECENT POSTS

Dewatering for the construction of an apartment complex in Sydney, NSW

NPE maintains a large and diversified range of high-end pumping, power generation and associated equipment…

Read More

Perth City Link Rail

NPE was contracted with the Perth City Link Rail Alliance to provide a detailed design,…

Read More

Roy Hill Iron Ore Train Unloader

The Roy Hill project includes the construction of a new iron ore mine at Roy…

Read More

Dewatering & Water Treatment at Perth Busport Project, WA

NPE were involved in this project for the drilling and installation of a series of…

Read More

Elizabeth Quay Project, WA

The Elizabeth Quay project is located in the centre of Perth’s river foreshore and located…

Read More