Old Murray Bridge Refurbishment – SA

Due to the recent Murray River flooding, NPE was tasked with supplying a pump set up to move 800,000,000 litres behind a levee bank as soon as possible so that the client could continue with their main works for the Old Murray Bridge Refurbishment Project.

NPE quickly mobilised the pump and 700m of hose to the site, delivering an effective solution that met the client’s requirements.