Well Point Dewatering, Perth WA

NPE were engaged by Alita Constructions to install dewatering at 2 different locations at their project located on Dowd St, Welshpool.

The purpose of the install was to allow the client to excavate below the water table to complete the final connection of the site stormwater system and install a large aerobic treatment unit.

We had our dewatering pumps and equipment delivered to site, the systems installed and running within 48 hours! The job ran for most of the week.

The client was really happy and the job was completed safely, and in a timely manner.