Wastewater Treatment Plant, VIC
As part of ongoing upgrades to Melbourne Water’s Western Treatment Plant, BMD Constructions are building a new 150 ML/d Nutrient Removal Plant (NRP) that will replace the existing 55E Activated Sludge Plant.
The project involves constructing five NRP clarifier tanks, interconnecting pipe works, blower and service buildings, and several pump stations. However, before the construction works could take place, it was necessary to engage NPE to provide a dewatering system. NPE rose to the challenge and designed and installed a horizontal dewatering system that included 13 piston pumps. Since its installation, the system has been operating smoothly with no failures.
Although there were some initial issues with the system, including air influx, these were resolved by trimming the pumps and installing air relief valves. Overall, the dewatering system has succeeded greatly, maintaining a steady groundwater level with no breakdowns.
RECENT POSTS
Dewatering for the construction of an apartment complex in Sydney, NSW
NPE maintains a large and diversified range of high-end pumping, power generation and associated equipment…
Read MorePerth City Link Rail
NPE was contracted with the Perth City Link Rail Alliance to provide a detailed design,…
Read MoreRoy Hill Iron Ore Train Unloader
The Roy Hill project includes the construction of a new iron ore mine at Roy…
Read MoreDewatering & Water Treatment at Perth Busport Project, WA
NPE were involved in this project for the drilling and installation of a series of…
Read MoreElizabeth Quay Project, WA
The Elizabeth Quay project is located in the centre of Perth’s river foreshore and located…
Read More