Dewatering for the construction of an apartment complex in Sydney, NSW

NPE maintains a large and diversified range of high-end pumping, power generation and associated equipment for hire or sale to suit any requirement. Committed to sourcing the world’s best equipment brands, NPE delivers the best-performing, safest and most reliable gear for your site.  NPE doesn’t just deliver a piece of equipment, we work with our…

Read More

Burwood Beach Wastewater Treatment Plant Bypass, NSW

Recently, NPE were engaged by regional water authorities to supply and install a 20” diesel bypass pump from a collection pit to the ABF tower to begin a flushing program on the ABF tower. The client required 450mm polyline and flows up to 450l/s at 24m rise. The discharge location was located at the ABF…

Read More

PFAS Treatment, Nelson Bay NSW

NPE were engaged by Rockform Developments to provide a complete groundwater dewatering, water treatment & environmental monitoring solution to facilitate the construction of a 9-storey mixed use building overlaying a two-level basement car park. The water treatment system needed to successfully remove PFAS, hydrocarbons, high levels of iron, dissolved metals, and other co-contaminants from the…

Read More

Newcastle West 1 Pump Station Upgrade, NSW

The pump station upgrade is a crucial project initiated due to the growth in population and the construction of new apartment buildings in the surrounding areas. Our client was engaged to upgrade the Newcastle West 1 Pump Station to meet the increasing wastewater management demand. The project involved complex engineering tasks, and NPE was responsible…

Read More

Summerhill Waste Management Centre

NPE were engaged by Newcastle City Council to provide an efficient, cost-effective and environmentally sustainable solution to desilt a lined leachate pond and subsequently dewater the sludge to produce dewatered cake with at least 20% dry solids content at the Summerhill Waste Management Centre. Desludging and dewatering works were initiated by the council to restore…

Read More

HB01 Wastewater Pump Station Temporary Works, Kilcare NSW

NPE were engaged to provide a temporary works proposal which details the operating strategy and management of the sewer bypass works for HB01 Wastewater pump station in Killcare. NPE utilised the latest telemetry options and control functions and supplied online log ins to the client. 3 x electric submersibles located within the collection manhole that…

Read More

Student Accommodation Development – NSW

Student Accommodation Development Dewatering was required to allow for the construction of student accommodation with a 2-level basement car park. Bulk excavation level approx. 5m BEGL with localised pits going further 1.5m deep to 6.5m BEGL. Installation of 240m perimeter dewatering system along with localised pit dewatering. Treatment to ANZEC 95% Freshwater guidelines. The Chemical…

Read More

Screening Solution, Sewage Treatment Plant – Byron Bay NSW

NPE was asked to provide a screening solution that would allow the local council to take their entire inlet works offline for an extended period to facilitate the strip out, re-coating and refurbishment of their inlet works at the Byron Bay sewage treatment plant. The solution required the sewage treatment plant to be operational 24/7…

Read More